Um unsere Website für Sie optimal zu gestalten und fortlaufend verbessern zu können, verwenden wir Cookies. Durch die weitere Nutzung der Website stimmen Sie der Verwendung von Cookies zu. Weitere Informationen zu Cookies erhalten Sie in unserer Datenschutzerklärung.
Era designation II
DRG
New 2019
 
DEVIATING ROAD NO.

Electric Locomotive E75 DRG

Road no.: E75 53

Item no. 43236
Direct current Analogue BASIC+
Prepared for locomotive sound
Available
Item no. 43238
Direct current Digital EXTRA
Integrated locomotive sound
Decoder Doehler & Haass
Available
Item no. 43239
Alternating current Digital EXTRA
Integrated locomotive sound
Decoder Doehler & Haass
Available
Direct current Analogue BASIC+

Prepared for locomotive sound

Direct current Digital EXTRA

Integrated locomotive sound

Decoder Doehler & Haass

Alternating current Digital EXTRA

176,8
Length over buffer in mm

Navigable minimum radius 360 mm

PluX22

2 wheels with fiction tyres

Locomotive has flywheel drive

Triple headlights and two red taillights alternating with the direction of travel

The model has a coupler pocket and short coupling cinematic

 

Model details

  • extra mounted handrails in low-material thickness
  • three-point support
  • finely detailed chassis
  • finest paintwork and printing
  • functioning pantographs (mechanical)
  • reproduction of machine room
  • LED lighting
  • metal arrangement of rods
  • metal wheels and frame
  • true-to-original different front windows and lanterns
  • prototypical multipart roof-fittings
  • high maintainability due to simple dismantling of the body
  • re-lubrication of the engine bearings and screws is possible through
    holes in the PC board and gearbox cover or after dismantiling of the body
 
 

Info about the original

In 1926, DRG ordered further electric locomotives as improvements on the E77 for operation in the southern and central German network. While the electrical systems remained virtually unchanged, a new one part  vehicle frame was designed with the axle sequence 1´BB1´. Due to the running gear changes, the maximum permissible speed was set at 70 km/h, raising hopes of better utility in mixed passenger and goods train  schedules. 79 locomotives were planned. E75 01-12 went to south Germany, while the E75 51-69 went to
Leipzig West, Wahren, Bitterfeld and Magdeburg-Buckau.

 

Further models of the same series

Electric Locomotive E75 DB AG
Schiene

Electric Locomotive E75 DB AG